What should a master do before coils of steel are loaded from a quayside?

MCA Oral Exam Questions
Typography

(1) Seek guidance from the P&I club correspondent as to extent of rusting that will be acceptable. 

(2) Arrange for an independent pre-load survey of the steel coils on the quayside. (3) If no surveyor is available, carry out a survey in person, taking photographs of the steel and recording.

 

BLOG COMMENTS POWERED BY DISQUS
Loading...

SPONSORED: Jokes, Crazy Videos and more... -  www.CrazyFans.com  No.1 Site!

backup content in case it doesn't work